67 jobs pulled mechanical, sprinkler, standpipe, boiler or plumbing permits with a declared cost over $500k ($124M in total). Another 56 jobs filed new MEP work that's still in design. Here are the 10 largest permitted jobs.
| Address | Declared cost | Permits | GC / owner | Scope |
|---|---|---|---|---|
| 29-10 THOMSON AVENUE, Queens | $16,000,000 | Mechanical Systems | JRM CONSTRUCTION MGMT LLC CUNY | Provide new AHUs for each floor and associate duct work and VAV boxes. Provide dedicated kitchen exhaust and make-up air for the culinary lab. All plans filed as herewith. |
| 695 PARK AVENUE, Manhattan | $14,000,000 | Mechanical Systems | INFINITY CONTRACTING SERV CITY UNIVERSITY OF NEW YORK | DEMOLITION AND INSTALLATION OF DUCTWORK, PIPING, AIR HANDLING UNITS, FAN COIL UNITS, FANS. |
| 2900 GOULDEN AVENUE, Bronx | $7,154,000 | Mechanical Systems | KORDUN CONSTRUCTION CORP DASNY | Replacement of air handler units and associated duct work at existing CUNY Library Lehman College Shuster Hall |
| 3031 MIDDLETOWN ROAD, Bronx | $4,922,500 | Plumbing | NEPTUNE MECHANICAL INC NEW YORK CITY HOUSING AUTHORITY | INTERIOR RENOVATION OF 18-STORY NYCHA MULTIPLE DWELLING AS PART OF THE NYCHA PACT RENOVATION: REPLACEMENT OF EXISTING KITCHEN AND BATHROOM FXITURES ON EXISTING ROUGH-IN. NO CHANGE IN USE, EGRESS OR OC |
| 100 WALL STREET, Manhattan | $4,698,000 | Plumbing | DONATO PLUMBING GROUP INC BLDG Management Co. | FILING FOR PLUMBING MODIFICATIONS IN CONJUCTION WITH RESIDENTIAL CONVERSION UNDER ALT-CO# M01312855-I1. PROJECT IS PART NYC DEVELOPMENT HUB CONSULTATION ON 8/5/25 AND MAJOR PROJECTS PROGRAM (MPP#501) |
| 3020 WILLIAMSBRIDGE ROAD, Bronx | $3,500,000 | Mechanical Systems | K&P BUILDERS CORP | New Apartment building proposed |
| 200 EASTERN PARKWAY, Brooklyn | $3,000,000 | Mechanical Systems | DYNAMIC US, INC BROOKLYN MUSEUM | APPLICATION IS FILED FOR MECHANICAL/ARCHITECTURAL WORK ASSOCITED WITH THE INSTALLATION OF THE HYDRONIC DISTRIBUTION PIPING FROM CELLAR TO ALL FLOORS AT BROOKLYN MUSEUM, IT WILL BE CONNECTED TO NEW BOI |
| 245 WEST 55 STREET, Manhattan | $2,900,000 | Plumbing, Sprinklers, Standpipe | G.N.T. MECHANICAL LLC MADIGAN DEVELOPMENT, LLC | modification to sprinkler/ standpipe system as per plans filed herewith. |
| 65-10 DIETERLE CRESCENT, Queens | $2,888,886 | Plumbing | MAR-SAL PLBG & HTG, INC NYC SCHOOL CONSTRUCTION | Q174- REPLACE ROOF DRAINS,FLOOR DRAINS & STORM PIPING WITH NEW. REPLACING SUMP PUMP WITH NEW. REMOVE EXISTING HW TANK, GAS PIPING, BOOSTER HEATER & ALL ITS APPURTENANCES. RELOCATE VENT PIPING. NEW HEA |
| 1 PENN PLAZA, Manhattan | $2,849,000 | Mechanical Systems | FRESH MEADOW MECHANICAL C VORNADO REALTY TRUST | Demolition of existing steam chiller, and associated piping and accessories throughout the level 12 MER. Steam chiller 2 and piping distribution shall be replaced with new water source heat pump, pipi |
The full list has every job with filing details, engineer of record and expediter, as a PDF and spreadsheet, every Monday.
Get the full list for $99/moOr get the top 10 free every Monday: subscribe by email.
Bidding one of these? The estimating desk for MEP subs: a priced, checked bid in 48 hours, or it's free. Send the drawings; your first bid is free.
Source: NYC Department of Buildings public filings and permits (DOB NOW). Declared costs are the filer's estimate. Business names only.